Auto Synchronizing and Auto Load Sharing of DG Sets ( Diesel Generator Sets) |
 |
 |
|
|
 |
 |
 |
|
|
Sequence of Operation |
|
|
|
( Please go through the sequence of operation
with reference to Single Line Diagram.) |
| |
 |
|
• |
When
mains are healthy, then both the D.G. Sets remain in the standby
mode. |
• |
When
mains fail, Line Voltage Monitor (L.V.M.) senses it. Starting
pulses are given to the Master D.G. Set. (Master D.G.Set is
automatically selected by program.) |
• |
After
satisfactory starting of the D.G.Set 1, voltage is sensed by
Generator Voltage Monitor (G.V.M.). If voltage is healthy, then
closing signal is given to D.G.1 breaker and it is closed. |
• |
Giving
corresponding pulses from the Synchronizing Panel can then
automatically start load. |
• |
The
load is then sensed by KW transducer in the panel &
continuously monitored by Programmable Logic Controller ( P.L.C.) |
• |
Engine
& Alternator parameters are also continuously monitored by
P. L. C. in the Panel. In case of any fault (e.g. Low Lube Oil
Pressure, High Cooling Water Temperature etc.), breaker is tripped
& engine is stopped. |
• |
If
the load reaches & crosses 80 % of the rated capacity of the
D.G. 1, then starting pulses are given to the second D.G.set from
P.L.C. |
• |
When
D.G.2 starts, then again G.V.M. checks the voltage, and if voltage
is healthy, then breaker 2 is closed |
• |
After
closing of the second breaker, Auto load sharing function starts
sharing the load between the two D.G.Sets. The percentage of
sharing is directly proportional to their individual capacities. |
• |
Since
sharing is proportional to their respective capacities, even
D.G. Sets of different capacities can be synchronized successfully. |
• |
D.G.sets
continue to run in Synchronization until the load is above 80 % of
any one D.G. Set. |
• |
When
load comes down below 80 % of any one D.G.Set, then the automatic
signal is given to that D.G. & then it starts taking the full
load. |
• |
After
transferring the total load to one D.G. (on which 80 % load is to
be connected), the breaker of the second D.G.is opened. Now one
D.G.is taking the load, which is less than 80 % of its rated capacity. |
• |
The
second D.G. is then stopped after its cooling period. |
• |
The
programme is repeated automatically for any variation of the load. |
• |
When
mains are resumed, then load is transferred to the mains &
both the D.G.sets are stopped after their cooling period. |
• |
The
percentage setting is programmable which can be set at any value
upto say 90 %. |
• |
For
stable operation even for sudden variations in the load,
programmed timers in PLC are used, which take action only after
stabilization of the load. |
• |
The
total Automatic operation has a manual override. In manual mode,
the total operation can be performed manually. |
• |
Auto
load shedding facility can be incorporated by suitable programming
of PLC. With this facility, various loads can be brought in or
switched off at particular time or for various intervals. |
• |
With
the same logic, 3, 4 or 5 sets of equal or different capacities
can be Synchronised, with Auto load sharing facility. |
|
| |
 |
|
Advantages of Auto Synchronizing and Auto Load Sharing |
| |
• |
The
total programme is based on load in KW. Hence the actual sharing,
starting, stopping & transfers are actual load dependent &
not on any other unrealistic parameter like voltage, current etc. |
• |
Changing
of scheme becomes very easy because of changes are made through
software only. There is no changing of wires, adding of components
like relays, contactors, which is very time consuming, cumbersome
& requiring additional space. |
• |
Along
with KW sharing, KVAr sharing & PF sharing is very accurate,
because of PLC programming. There is no possibility of any unequal sharing
as regards KW, KVAr & PF. |
• |
For
any type of load addition or reduction, manual intervention as
regards D.G.set operation is not required. However, in case of
emergency manual override is possible.
|
• |
Special
programmers using Real Time Clock (RTC) are possible. With this
facility, along with KW dependent programs; day, date & time
dependent programmers are possible. |
• |
Because
of KW dependent load sharing, optimum utilization of D.G. sets are
possible. This increases D.G. sets efficiency & saves lot of
fuel. |
• |
D.
G.sets are always tried to run with 80 % to 90 % load factor,
where we get maximum efficiency of D.G.sets. This is easily
possible with our system. |
• |
Because
of PLC operation, hardware like relays, contactors, wiring etc is
reduced drastically. This reduces fault points & increases the
MTBF of the system. |
• |
If
any changes are required to be made in future, then there is no
need of additional hardware like relays, contactors etc. There is
also no need to make new wiring or changes in the wiring. All the
changes / modifications can be easily made through software only. |
|
|
|
|
|
 |
 |
 |
 |
|
| |
|
|
 |
|
|